- Structure-Supporting Design:
- Available sizes: 6” to 20”
- Operating temperature: -196°C
- Design pressures: 19 barg (class 150) or 50 barg (class 300)
- Materials: High-grade stainless steel (304L or 316L)
- Advanced Safety Systems:
- Cryogenic Emergency Release System (ERS) with or without independent valve operation
- Quick Connect/Disconnect Couplers (QCDC) for fast and secure connections
- SIL-rated systems for guaranteed safety and reliability
- >Ease of Maintenance:
- In-situ seal replacement
- Minimal downtime and reduced costs with well-designed maintenance aids
- Enhanced Monitoring:
- Constant Position Monitoring System (CPMS) for real-time feedback and control
- Integration-ready with berth visualization systems
- Custom Engineering:
- Options for heating, insulation, and vapor return lines
- Flexible solutions tailored to specific LNG terminal requirements
LNG Marine Loading Arm
Innovative LNG Marine Loading Arms by Emco Wheaton - Petrochemical
Empowering Safe and Efficient LNG Transfer Solutions
