The Emco Wheaton B0330 model is compatible with a range of additional accessories: Emergency Release System (ERS), swivel joints, blowdown system, nitrogen purge system and others. The Emco Wheaton B0330 marine loading arm was designed from the ground up to meet the following CNG challenges:.
The advantages over hose loading facilities are:
- High reliability
- High strength materials
- Easy handling
- Minimum maintenance - minimal maintenance and with the possibility to replace the product seals without scaffolding or dismantling the loading arm itself
- Highly engineered to customer specifications
- Swivel joint designed and tested according to OCIMF 4th edition 2019. Over 15 years of proven reliability for CNG application without any failure