Back to the product list

Marine Loading Arm - B0330

Emco Wheaton’s B0330 High Pressure Marine Loading arm is engineered to safely and efficiently load and unload compressed natural gas (CNG) from Floating Storage Regasification Units (FSRU).


The B0330 is the latest type of loading arm for CNG applications developed by Emco Wheaton, which incorporates elements of the very reliable B0300 and B0030 models.

Thanks to the use of high strength materials, the B0330 provides an optimized light weight design and features minimal maintenance with the ability to replace the product seals without scaffolding or dismantling the loading arm itself.

The Emco Wheaton B0330 model is compatible with a range of additional accessories: Emergency Release System (ERS), swivel joints, blowdown system, nitrogen purge system and others.

 

Features

Related Products